Brief
Hines Picks Up Site for 572K-SF Phoenix Industrial Project
Hines has acquired Cactus 303, a shovel-ready development site located in the West Valley of Phoenix off Loop-303, entitled for a three-building, class-A industrial project totaling 572,282 square fee

Summary
Hines has acquired Cactus 303, a shovel-ready development site located in the West Valley of Phoenix off Loop-303, entitled for a three-building, class-A industrial project totaling 572,282 square feet.
Construction is expected to begin this summer.
The development comprises a 395,000-square-foot cross-dock building and two rear-load buildings of 102,000 and 75,000 square feet, respectively, with... The post Hines Picks Up Site for 572K-SF Phoenix Industrial Project appeared first on Con
Source
- Connect CREconnectcre.com
